Memorial Park Ballfield Safety Improvements
The Project consists of furnishing all materials, labor, equipment, and supervision for the installation of ballfield backstops, poles, netting, prefabricated dugouts, prefabricated picnic shelter, electrical work, fencing, concrete sidewalk, retaining walls, and performance of such additional and incidental work as called for by the Specifications and Contract Documents.
The estimated Project cost range is $650,000 – $750,000.
Bid documents, including project specifications will be available for download beginning on Monday March 9, 2026 after 8:00 a.m. You can download them at www.questcdn.com and input #10077487.